Weekly Report Sept. 27 - Oct. 04
Group-
-Wrote the Project Specifications
-Obtained related books from the library
-Had some ideas of what type of solution to use
Enes -
-Worked on Project Specifications with Jason
-Looked at a possible solution to our problem, Ringer's Lactate
-Checked on the composition of Ringer's Lactate since it is the substance that is used in the hospitals
-Found a possible source, where Ringer's Lactate can be obtained for testing purposes
Jason-
-Read over the dielectric probe manual and how to calibrate the network analyzer
-Worked on the project specifications
Omar-
-Got familiarized with the code
-Ideas on how to modify it
-Installed the link cable between the network analyzer and computer.
Plans for next week-
-Research work that has been done so far on the dielectric constant of various saline solutions
-Do tests if time allows
-Obtain the information on the current usage of the saline solution that MegaWave uses.