 |
25-Apr-2000 |
The latest build of the system is available on my FTP site. |
 |
20-Apr-2000 |
This is the latest build of the system. |
 |
2-Mar-2000 |
The various diagrams which can be used to describe the system. |
 |
17-Feb-2000 |
An analysis of the important software qualities with regard to this project. |
 |
10-Feb-2000 |
A maximum 10 page specification for the project. |
 |
3-Feb-2000 |
Presentation on the general topic and layout of the project. Maximum of five slides. |
 |
31-Jan-2000 |
Abstract of project due to Prof. Demurjian by 9:00AM. |
| |
27-Jan-2000 |
First class, formation of team, receipt of assignment & related materials. |